Production Support Services

We take on the production-heavy portions of Phase I and Phase II ESAs, broader environmental project work, and stormwater compliance and hand your firm an organized, near-final deliverable — built to your templates and ready for your Environmental Professional’s review and sign-off.

Phase I ESA Production Support

Commercial Real Estate · ASTM E1527 / E2247 / E1528

We handle the legwork and documentation behind a Phase I ESA so your senior staff can focus on technical review. You assign the project; we deliver a structured, near-final draft prepared to ASTM E1527 for commercial real estate — incorporating ASTM E2247 for forestland and rural property, or a lighter ASTM E1528 Transaction Screen when early screening is all a deal needs — for your EP’s review.

  • Project intake and due-diligence coordination
  • Historical records research — aerials, Sanborn maps, city directories, topographic maps
  • Regulatory database review support
  • Site reconnaissance support and photo documentation
  • Owner / occupant / contact interview support
  • Data and file organization to your standards
  • Draft report preparation with exhibits and appendices
  • Internal QA checklist before EP review

Final REC / CREC / HREC determinations, report approval, and professional sign-off remain with your Environmental Professional.

Discuss a Pilot

Who it’s for

Engineering, land development, and environmental consulting firms with an in-house or partner Environmental Professional who need dependable production capacity.

Phase II ESA Production & Field Support

Subsurface Investigation Support · ASTM E1903

When a Phase I identifies conditions warranting further investigation, we provide the field and production support behind a Phase II — performed under your firm’s work plan, direction, and Environmental Professional oversight.

  • Sampling and work-plan preparation support
  • Soil, groundwater, and soil-gas sample collection
  • Field screening, boring and monitoring-well logging support, and field documentation
  • Sample handling, preservation, chain-of-custody, and laboratory coordination
  • Analytical data compilation, tabulation, and comparison to regulatory screening levels for EP review
  • Draft Phase II report preparation, figures, and data tables
  • On-site health & safety compliance (40-Hour OSHA HAZWOPER certified)

Investigation design, data interpretation, contamination conclusions, and any recommendations remain with your Environmental Professional.

Discuss a Pilot

Who it’s for

Firms that need dependable field and sampling capacity to execute a Phase II under their EP’s direction.

Broader Environmental Project Support

Planning, Permitting & Project Support

Beyond Phase I and Phase II ESAs, we support the environmental components that arise in development and engineering projects — scoped by your team and performed under your supervision and final review.

  • Environmental constraints and site-condition research for planning and feasibility
  • Regulatory and permitting research (federal, state, and local)
  • Historical land-use and aerial/records review
  • Environmental data compilation, organization, and GIS-based mapping support
  • Technical writing for environmental sections of project deliverables
  • Sampling-related coordination and field documentation under your direction
  • Synthesis of environmental findings into clear, review-ready summaries

Discuss a Project

Who it’s for

Land development and engineering firms that need environmental research, documentation, and technical writing support within their projects.

Stormwater Compliance Services

Subcontract Inspection Support · CGP · MSGP · CDHT

TerraScope Environmental Services helps clients meet Utah stormwater compliance requirements through field inspection, documentation, and sampling support. We provide subcontract inspection support for:

Service AreaSupport Provided
CGP Construction SitesRoutine inspections, post-storm inspections, corrective-action re-inspections, BMP documentation, photo logs, and electronic reporting
MSGP Industrial FacilitiesQuarterly inspections, visual assessments, annual site evaluations, benchmark sampling support, field pH, chain-of-custody, and lab delivery coordination
CDHT DischargesField monitoring, discharge observations, pH/turbidity/flow checks, grab sampling, chain-of-custody, and support during active dewatering or hydrostatic testing periods

Our work is designed to help environmental consultants, SWPPP providers, and project teams maintain compliance while adding field capacity when inspection schedules, storm events, or active discharge periods create workload pressure.

Need stormwater inspection support in Utah? Contact TerraScope to discuss recurring routes, overflow inspection support, or project-specific field monitoring.

Discuss Inspection Support

Who it’s for

Environmental consultants, SWPPP providers, and project teams that need added field capacity for inspections, storm events, and active discharge periods.

The standards we work to

Understanding the assessment levels

Phase I production support can be prepared to different ASTM standards depending on the property and the deal — here’s how the levels compare.

Transaction Screen
ASTM E1528-22
Phase I ESA
ASTM E1527-21
Forestland & Rural Phase I
ASTM E2247-23
Best forEarly screening, cash deals, portfolio triageCommercial real estate due diligenceAgricultural, forest, rural & undeveloped land
Satisfies EPA All Appropriate Inquiries (AAI)NoYesYes
CERCLA landowner liability protectionNoYesYes
Typically accepted by lendersRarelyYesYes
ScopeLimited screenFull assessmentFull assessment, rural-adapted

All assessments are produced for your firm’s review; final determinations and sign-off remain with your Environmental Professional.

Ways to work together

Flexible engagement, built around your workflow.

Pilot Project

A low-risk start of one to three assignments so your team can evaluate our process, quality, and responsiveness.

Per-Project

Fixed-fee or project-based support for specific assignments, on your schedule.

Ongoing Overflow

A standing arrangement for periods of high workload or continuous production assistance.

Discuss a Pilot